
New open top container: 900 g/m² military-grade tarpaulin factory-fresh
The new open top container leaves the factory with a white or blue 900 g/m² PVC tarpaulin, removable steel galvanised hoops and an upper frame reinforced to withstand crane impacts. Usable volume identical to standard (33 m³ in 20' / 67 m³ in 40'), but full access from above — the only way to load machines over 2.30 m high.
Price 2026 by status
The new open top container leaves the factory with a white or blue 900 g/m² PVC tarpaulin, removable steel galvanised hoops and an upper frame reinforced to withstand crane impacts. Usable volume identical to standard (33 m³ in 20' / 67 m³ in 40'), but full access from above — the only way to load machines over 2.30 m high.
| Status | Price Excl. VAT | For what use |
|---|---|---|
| Open top 20 ft new | €3 800 – €5 000 | Machines, IBC, recurring project |
| Open top 40 ft new | €5 200 – €6 800 | Long wood, profiles, long equipment |
| New open top tarpaulin colour custom made | +€300 – +€600 | Brand identity, visible project |
Excluding delivery. Lead time 10-14 weeks for direct factory order. In stock at EU depot: 7-15 days depending on tarpaulin colour.
For whom?
Industrial transport of sensitive machine tools, metal structure manufacturer (IPN, trusses), large equipment exporter. New is justified when the shipper requires a new tarpaulin (strict marine insurance) or when the project has multiple rotations over five years (tarpaulin amortisation).
Key points to remember
- New 900 g/m² PVC military-grade tarpaulin, 5-year warranty (puncture, UV)
- 3-4 galvanised steel hoops per 20', 5-6 per 40', removable
- Reinforced upper frame for lifting impact resistance
- Apitong flooring 28 mm new, point load 3.5 t/m²
- CSC plate new, CTU (Cargo Transport Unit) IMO certification
Frequently Asked Questions
Why does the tarpaulin roof of a new open top cost £1 200 more than a standard dry container?+
The PVC cover at 900 g/m² costs £600-£900 on its own, plus 4-6 galvanised steel bows (€250 each), plus reinforced frame (+£300 in material). For a brand new one, you also pay for the 5-year cover — the same cover ages to second-hand condition within 5-8 years outdoors.
What weight can the frame of a new open top support during lifting?+
Total gross permissible load: 30,480 kg (new 40' open top, ISO standard 1496-1). Lifting by the four upper ISO corners only, never by the bows (which are removable). For frame lifting, use a certified CMU 30 t crane.
Is the new open top certified for sea and rail transport?+
Yes: CSC plate + CTU certification according to IMO code. The transcontinental rail route (Asia-Europe via Russia/Kazakhstan) often requires a new open top due to customs inspections and cover traceability.
Can the cover be partially rolled back for side loading?+
Yes: cover tensioned by straps with buckles, unfasten straps on one side to roll back 1/3 or 1/2 of length. Allows front loader access without completely removing cover. Expect 15-20 minutes at two people to re-cover properly.
Receive 5 quotes within 48 hours
Compare the best suppliers in your region — free, no commitment.