A poorly connected reefer = compressor wears out prematurely, cold chain breakage, and insurance decline coverage. This guide details the three connection options (three-phase grid, generator, solar), kVA sizing by format, and the most common technical pitfalls.

Electrical connection

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market.

CEE Plug 32 A (standard reefer)

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market. Estimates to confirm locally: £315 – £840.

CEE Plug 63 A (deep freezing, park)

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market. Estimates to confirm locally: £840 – £2,100.

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market. Estimates to confirm locally: £1,050 – £5,250.

Dimensioning kVA: reference table

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market.

Format / usageNominal powerStart-up peakRecommended generatorCEE socket
20 feet refrigeration (+2 to +8 °C)3-5 kW8-10 kW15 kVA32 A
20 ft refrigerated container (-18 to -25 °C)5-7 kW10-12 kW20 kVA32 A
40 ft refrigerated container4-7 kW10-12 kW20 kVA32 A
40 ft HC refrigerated container6-8 kW12-15 kW25 kVA63 A
Reefers park of 3 units12-20 kW25-35 kW50 kVATableau 63 A
Reefers park of 5-8 units (logistics)25-50 kW50-80 kW80-125 kVAdedicated dashboard

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market.

Option 2 — Autonomous Generator Set

Essential when there is no three-phase power available on site: festival, isolated construction site, remote agricultural operation. The diesel generator remains the most flexible solution, but involves a real logistical commitment (fuel, maintenance, noise).

Fuel Consumption

3-6 L/h at 60-70 % load. That is 70-145 L/day continuously. For a 10-day festival: 700-1 450 L = £945 – £1,890 in diesel fuel. Plan for a 500-1 000 L fuel tank + strict refuelling schedule.

Generator Rental Cost

15 kVA: £84 – £126/day. 25 kVA: £126 – £189/day. 50 kVA: £210 – £368/day. Some reefer rental companies offer packages « reefer + generator + initial fuel » at a decreasing rate — saving 15-25 % compared to separate rentals.

Noise Pollution

Check manufacturer sound data and measurement conditions, siting and local noise or event-permission rules. Hours and limits are not universal. Plan separation, acoustic screening and maintenance while preserving ventilation and safety.

Option 3 — Autonomous Solar Power (humanitarian or low-carbon pro case)

Emerging option, mainly used in humanitarian contexts (MSF, Red Cross) and organic agricultural operations. Solar panels + buffer battery + low-consumption specific reefer. More expensive upfront but total autonomy — no fuel, no connection.

ItemRangeNote
Low consumption reefer (2-3 kW)+£3,150 – £8,400 vs standard reeferVariable compressor, reinforced insulation
Solar panels (4-8 kWc)£6,300 – £15,750Surface 25-50 m² roof or ground
Lithium battery (10-20 kWh)£8,400 – £21,000Autonomy night + covered days
Inverter + regulation£2,100 – £5,250Three-phase, IoT monitoring
Total extra£19,950 – £50,400Payback period 4-8 years vs diesel

Interesting solution for continuous use > 2 years in off-grid areas. Not profitable for occasional use (festival, short season) where renting a diesel generator remains unbeatable.

Frequently Asked Questions

Can you plug a reefer into a domestic socket at 220 V?+

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market.

What is the difference between 32 A and 63 A three-phase?+

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market.

How much does a reefer consume per day on average?+

Depends on the set temperature, external temperature and door opening frequency. Refrigeration +2 to +8 °C (standard food industry) : 60-120 kWh/day for a 20 ft container, 90-160 kWh/day for a 40 ft container. Freezing -18 to -25 °C : 120-180 kWh/day (20') and 160-240 kWh/day (40'). At £0.21/kWh commercial rate : £13 – £50/day of electricity consumption. Double in summer with strong external heat.

What generator power should I choose?+

Sizing rule: nominal reefer power × 2 to absorb start-up peaks and thermal margin for summer. A 20 ft refrigeration unit (4-5 kW nominal) can manage a 15 kVA generator. A 40 ft freezing unit (7-8 kW nominal) requires at least a 25 kVA generator. For a fleet of 3-4 reefers: 50-80 kVA centralised generator. Under-sizing = repeated tripping, premature compressor wear. Over-sizing = unnecessary fuel consumption.

How much fuel does a 20 kVA generator consume?+

Calculation scenario to replace with generator data and a current local price: assuming 3–6 L/h for 24 hours gives 72–144 L/day. At an assumed 1.20–1.40 £/L, fuel alone is around 86–202 £/day, or 860–2 020 £ over ten days. This is neither an observed local price nor guaranteed consumption. Load, setpoint, weather, operating hours and generator alter the result; confirm autonomy, reserve and refuelling, and local fuel-storage rules.

Do I need a qualified electrician to connect it?+

Have a competent electrician check the connection against the rules in the United Kingdom, the equipment rating plate and the local network operator’s requirements. A French standard or certificate does not automatically apply to this market. Estimates to confirm locally: £315 – £840, £1,575 – £4,200.

Your reefer is well supplied with electricity upon delivery

Our supplier partners assess your connection and propose the best electrical configuration.

Electrical supply for reefer: three-phase, kVA | ContainerEU